Civic Center Blvd Asphalt Concrete Overlay and Water Line Replacement

The work to be performed in general, consists of supplying all labor, materials, tools, equipment, implements and methods of process to remove and replace a waterline and resurface Civic Center Boulevard from Lotz Way to Driftwood Drive. The waterline segments to be removed and abandoned may be classified as hazardous or special waste or asbestos-containing material (ACM). The work also includes surface preparation of all streets; removal and replacement of curb ramps to meet ADA requirements; removal and replacement of a sanitary sewer manhole; removal and replacement of a fire hydrant; raising to grade existing utility covers; protection of existing utilities; pavement delineation; and all other work as shown on the Project Plans

Status

Bidding Closed

Prebid Date7/16/20 1:30pm

Bid Date7/28/20 2:00pm

Company & Contacts

City of Suisun
Nick Lozano  
707-421-7344

Location

Suisin City, CA

Engineer’s Estimate: $800,000.00