Railroad Ave Pavement Rehabilitation

The base project consists of pavement rehabilitation which includes base failure repairs, asphalt grinding, and 2” asphalt concrete overlay on eastbound Railroad Avenue from Village Drive to Sunset Avenue, as well as upgrading the existing curb ramps to ADA-compliant curb ramps. The base project also includes upgrading the existing bicycle lanes to buffered bicycle lanes on both side of Sunset Avenue from Marina Boulevard to Sunset Avenue. Additive alternates include base failure repairs on eastbound Railroad Avenue from Birchwood Court to Village Drive, as well as placing paving mat within the roadway segment to receive 2” asphalt concrete overlay.
Specifications (click to expand/collapse)