Suisun Marina Dock Box Replacement Project
The work to be performed, in general, consists of supplying all labor, materials, tools, equipment, implements and methods of process to complete the following work: Removing and replacing the existing 112 dock boxes, which are potable water points of connection. This includes disconnecting and reconnecting the potable water system and electric power in the new supplied dock boxes.
Addendum 1
(click to expand/collapse)

Name | Size | |||
Addendum No. 1_Docks Box Replacement Project.docx | 71.2 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
Addendum No. 2_Docks Box Replacement Project.docx | 71.7 KB |