Suisun Marina Docks Water Line Replacement Project

The work to be performed, in general, consists of supplying all labor, materials, tools, equipment, implements and methods of process to complete the following work: Removing and replacing the existing PVC domestic water lines with new HDPE water lines within the docks and the gangways, commencing at the potable water points of connection at the water side of the seawalls. The points of connection are at the seawalls and are generally located under the gangways. The project also includes replacing the onshore water supply lines at the following three locations: 1) Gang way (west dock) by the Suisun City marina office, 2) Gangway (west dock) at the easterly terminus of Walnut Street, and 3) Gangway (east dock) at the Solano Yacht Club. The water supply line replacement is from the seawalls to the closest water gate valves. Onshore work also includes removing and replacing gate valves, reduced backflow preventer assemblies and double check detector valve assemblies with Fire Department Connections (CDFs).
Plans (click to expand/collapse)