Green Stormwater Infrastructure Project
The general project scope includes converting an existing ditch into a bioretention facility along the east perimeter of the Suisun City Park and Ride Lot located at the northwest corner of Lotz Way and Civic Center Boulevard. The project scope also includes, but is not limited to landscaping/irrigation and paving, as well as installing trash capture devices, fencing, interpretive signage, and gravel blankets.
Status
Bidding Closed
Bid Date | 8/16/23 2:00pm |
Company & Contacts
City of Suisun
Nick Lozano (nlozano@suisun.com) /
Gemma Geluz (ggeluz@suisun.com)
Location
Suisun City, CA
The Engineers Estimate is $700,000