McCoy Creek Trail Phase 2 Improvements
The general work consists of installation of approximately ¾ mile long pedestrian/bike reinforced concrete trail, a prefabricated pedestrian steel bridge over Laurel Creek, bridge abutment reinforced concrete abutments, deep CIDH reinforced concrete pier foundations, vertical curb bulb-outs, enhanced crosswalks, solar powered rectangular rapid flashing beacons RRFB’s and addition of street lights at each street crossing, traffic striping and pavement markings, signage, replacement of sidewalks and driveways with combined trail ramps/driveway approaches, landscaping, plantings and miscellaneous exercise equipment and furnishings along the new trail, and stackable precast concrete block retaining walls.
Status
Bidding Closed
Bid Date3/17/22 2:00pm
Company & Contacts
City of Suisun
Nick Lozano
nlozano@suisun.com
Location
Suisun City, CA
For bonding purposes, the Engineers Estimate is $3.2 million.